Risk Assessment Skill
Objectives
Provide structured methodology for identifying and analyzing risks:
- Systematic risk identification
- Impact and probability assessment
- Mitigation strategy development
Risk Categories
Technical Risks
| Risk Type |
Examples |
Indicators |
| Performance |
Latency, throughput issues |
Benchmark gaps, load test failures |
| Scalability |
Growth limitations |
Architecture constraints, bottlenecks |
| Reliability |
System failures, data loss |
SPOF, recovery gaps |
| Security |
Vulnerabilities, breaches |
CVEs, compliance gaps |
| Integration |
API incompatibilities |
Version conflicts, protocol mismatches |
Implementation Risks
| Risk Type |
Examples |
Indicators |
| Timeline |
Delays, scope creep |
Complexity underestimation |
| Resource |
Skill gaps, turnover |
Training needs, market scarcity |
| Quality |
Technical debt, bugs |
Code coverage gaps, review failures |
| Dependency |
Third-party failures |
Vendor instability, EOL products |
Business Risks
| Risk Type |
Examples |
Indicators |
| Financial |
Budget overrun, hidden costs |
Incomplete TCO analysis |
| Strategic |
Lock-in, obsolescence |
Single vendor dependency |
| Operational |
Downtime, productivity loss |
Change management gaps |
| Compliance |
Regulatory violations |
Certification requirements |
Risk Assessment Matrix
Probability Scale
| Level |
Description |
Likelihood |
| 5 |
Almost Certain |
>90% |
| 4 |
Likely |
60-90% |
| 3 |
Possible |
30-60% |
| 2 |
Unlikely |
10-30% |
| 1 |
Rare |
<10% |
Impact Scale
| Level |
Description |
Effect |
| 5 |
Critical |
Project failure, major loss |
| 4 |
Major |
Significant delay, budget overrun |
| 3 |
Moderate |
Notable impact, recoverable |
| 2 |
Minor |
Limited impact, easily managed |
| 1 |
Negligible |
Minimal impact |
Risk Score = Probability × Impact
| Score |
Priority |
Action |
| 15-25 |
Critical |
Immediate mitigation required |
| 8-14 |
High |
Mitigation plan essential |
| 4-7 |
Medium |
Monitor and plan contingency |
| 1-3 |
Low |
Accept and monitor |
Mitigation Strategies
Strategy Types
- Avoid: Eliminate the risk source
- Transfer: Shift risk to third party (insurance, contracts)
- Mitigate: Reduce probability or impact
- Accept: Acknowledge and prepare contingency
Mitigation Plan Template
## Risk: [Risk Name]
**Category**: [Technical/Implementation/Business]
**Probability**: [1-5]
**Impact**: [1-5]
**Risk Score**: [P × I]
### Description
[Detailed risk description]
### Root Cause
[What causes this risk]
### Impact Analysis
- Best case: [Outcome]
- Most likely: [Outcome]
- Worst case: [Outcome]
### Mitigation Strategy
- Strategy type: [Avoid/Transfer/Mitigate/Accept]
- Actions:
1. [Action 1]
2. [Action 2]
- Cost: [Mitigation cost]
### Contingency Plan
[What to do if risk occurs]
### Monitoring
- Trigger indicators: [Warning signs]
- Review frequency: [Weekly/Monthly]
Output Specification
Risk assessments should include:
- Risk register with all identified risks
- Heat map visualization (probability vs impact)
- Top risks with mitigation plans
- Residual risk summary
- Monitoring recommendations