Time Stepping
Goal
Provide a reliable workflow for choosing, ramping, and monitoring time steps plus output/checkpoint cadence.
Requirements
- Python 3.10+
- No external dependencies (uses stdlib)
Inputs to Gather
| Input |
Description |
Example |
| Stability limits |
CFL/Fourier/reaction limits |
dt_max = 1e-4 |
| Target dt |
Desired time step |
1e-5 |
| Total run time |
Simulation duration |
10 s |
| Output interval |
Time between outputs |
0.1 s |
| Checkpoint cost |
Time to write checkpoint |
120 s |
Decision Guidance
Time Step Selection
Is stability limit known?
āāā YES ā Use min(dt_target, dt_limit Ć safety)
āāā NO ā Start conservative, increase adaptively
Need ramping for startup?
āāā YES ā Start at dt_init, ramp to dt_target over N steps
āāā NO ā Use dt_target from start
Ramping Strategy
| Problem Type |
Ramp Steps |
Initial dt |
| Smooth IC |
None needed |
Full dt |
| Sharp gradients |
5-10 |
0.1 Ć dt |
| Phase change |
10-20 |
0.01 Ć dt |
| Cold start |
10-50 |
0.001 Ć dt |
Script Outputs (JSON Fields)
| Script |
Key Outputs |
scripts/timestep_planner.py |
dt_limit, dt_recommended, ramp_schedule, notes |
scripts/output_schedule.py |
output_times, interval, count |
scripts/checkpoint_planner.py |
checkpoint_interval, checkpoints, overhead_fraction, warnings |
output_schedule.py count is endpoint-inclusive: it includes both t_start and t_end, so count = number_of_intervals + 1 (e.g. t=0..5 at 0.05 spacing yields 101 frames for 100 intervals).
Workflow
- Get stability limits - Use numerical-stability skill
- Plan time stepping - Run
scripts/timestep_planner.py
- Schedule outputs - Run
scripts/output_schedule.py
- Plan checkpoints - Run
scripts/checkpoint_planner.py
- Monitor during run - Adjust dt if limits change
Conversational Workflow Example
User: I'm running a 10-hour phase-field simulation. How often should I checkpoint?
Agent workflow:
- Plan checkpoints based on acceptable lost work:
python3 scripts/checkpoint_planner.py --run-time 36000 --checkpoint-cost 120 --max-lost-time 1800 --json
- Interpret: Checkpoint every 30 minutes, overhead ~6.7% (Acceptable per the interpretation table), max 30 min lost work on crash.
Pre-Run Checklist
CLI Examples
# Plan time stepping with ramping
python3 scripts/timestep_planner.py --dt-target 1e-4 --dt-limit 2e-4 --safety 0.8 --ramp-steps 10 --json
# Schedule output times
python3 scripts/output_schedule.py --t-start 0 --t-end 10 --interval 0.1 --json
# Plan checkpoints for long run
python3 scripts/checkpoint_planner.py --run-time 36000 --checkpoint-cost 120 --max-lost-time 1800 --json
Error Handling
| Error |
Cause |
Resolution |
dt-target must be positive |
Invalid time step |
Use positive value |
t-end must be > t-start |
Invalid time range |
Check time bounds |
checkpoint-cost must be < run-time |
Checkpoint too expensive |
Reduce checkpoint size |
Interpretation Guidance
dt Behavior
| Observation |
Meaning |
Action |
| dt stable at target |
Good |
Continue |
| dt shrinking |
Stability issue |
Check CFL, reduce target |
| dt oscillating |
Borderline stability |
Add safety factor |
Checkpoint Overhead
| Overhead |
Acceptability |
| < 1% |
Excellent |
| 1-5% |
Good |
| 5-10% |
Acceptable |
| > 10% |
Too frequent, increase interval |
Verification checklist
Common pitfalls & rationalizations
| Tempting shortcut |
Why it's wrong / what to do |
"Implicit scheme, so any dt is fine ā skip --dt-limit." |
Unconditional stability is not accuracy; a large dt still ruins temporal error and resolves no transient. Still pass a physics-based dt-target and re-check the recommended dt against time scales. |
"Set --safety above 1.0 to take bigger steps." |
safety is a margin at or below the limit; safety > 1.0 would return a dt above the stability limit, so the planner rejects it (exit 2). Lower dt-limit expectations or use a finer mesh instead. |
| "It ran without crashing, so the dt is valid." |
Run completion is not correctness. Verify dt_recommended <= dt_limit, read the notes array, and re-plan whenever v_max, D, dx, or the scheme changes ā the limit moves with them. |
"The output count looks one too many ā drop the last frame." |
count is endpoint-inclusive by design (intervals + 1); both t_start and t_end are real outputs. Trimming it silently loses the final state. |
| "Checkpoint every step to never lose work." |
That drives overhead_fraction past 10% (the planner emits a warnings entry) and dominates runtime. Use --max-lost-time (cap) or --mtbf (Daly) so overhead stays in the Acceptable band. |
| "Reuse last week's dt/checkpoint plan; the model is basically the same." |
Stability and optimal checkpoint interval depend on current dx, velocity/diffusivity, checkpoint-cost, and MTBF. Re-run the three scripts with current values rather than copying stale numbers. |
Security
Input Validation
- All numeric parameters (
dt-target, dt-limit, safety, t-start, t-end, interval, run-time, checkpoint-cost, max-lost-time) are validated as finite positive numbers (non-finite values such as inf/nan are rejected)
safety is bounded to <= 1.0 (a safety factor is a stability margin at or below the limit; values above 1.0 are rejected)
ramp-steps and preview-steps are validated as non-negative integers with an upper bound of 1,000,000; only the previewed slice of the ramp is materialized to bound memory use
- Time range consistency is enforced (
t-end must exceed t-start; checkpoint-cost must be less than run-time)
File Access
- Scripts read no external files; all inputs are provided via CLI arguments
- Scripts write only to stdout (JSON output); no files are created unless the agent explicitly uses the Write tool
Tool Restrictions
- Read: Used to inspect script source, references, and user configuration files
- Bash: Used to execute the three Python planning scripts (
timestep_planner.py, output_schedule.py, checkpoint_planner.py) with explicit argument lists
- Write: Used to save generated time-step plans or checkpoint schedules; writes are scoped to the user's working directory
- Grep/Glob: Used to locate relevant files and search references
Safety Measures
- No
eval(), exec(), or dynamic code generation
- All subprocess calls use explicit argument lists (no
shell=True)
- Scripts use only Python standard library; no pickle loading or deserialization of untrusted data
- All output is deterministic JSON with no shell-interpretable content
Limitations
- Not adaptive control: Plans static schedules, not runtime adaptation
- Assumes constant physics: If parameters change, re-plan
References
references/cfl_coupling.md - Combining multiple stability limits
references/ramping_strategies.md - Startup policies
references/output_checkpoint_guidelines.md - Cadence rules
Version History
- v1.2.2 (2026-06-24): Added Verification checklist and Common pitfalls & rationalizations sections grounded in the three planning scripts' actual outputs
- v1.2.0 (2026-06-23): Corrected overhead/frame-count docs and evals, removed output-time float drift, hardened input validation (checkpoint-cost < run-time, safety <= 1.0, bounded ramp/preview steps, finite checks)
- v1.1.0 (2024-12-24): Enhanced documentation, decision guidance, examples
- v1.0.0: Initial release with 3 planning scripts